Archive for August, 2011
Now that everything is cleaned up, we went and updated the plumbing and electrics.
Every bathroom needs it’s own 20 Amp circuit, so the electrician ran a new wire down to the panel in the basement, and replaced all the wiring to the bathroom. We installed a new fan and light combination, which is ducted through the attic to the outside.
In renovations, things that aren’t planned for do happen. A defective fitting on one of the new shower valve stops leaked ..read more

